Case Study: Guy Briggs and the Olympic Park Strategy
A review of the extensive planning behind the London Olympic Park and the Lower Lea Valley regeneration
A review of the extensive planning behind the London Olympic Park and the Lower Lea Valley regeneration
Rashiq Fataar inteviews Guy Briggs, who led a team which prepared the regeneration strategy for the Lower Lea Valley – the wider area in which the London Olympic Park is situated. So what does it take to design an Olympic Park? Part 2 here.
Rashiq Fataar inteviews Guy Briggs, who led a team which prepared the regeneration strategy for the Lower Lea Valley – the wider area in which the London Olympic Park is situated. So what does it take to design an Olympic Park?