Silo 3 & 4 mixed-use buildings under construction at V&A Waterfront
Makeka Design Lab in joint venture with VDMMA have been appointed for the design of Silo 3 and 4, two
Makeka Design Lab in joint venture with VDMMA have been appointed for the design of Silo 3 and 4, two
How do you turn forty-two vertical concrete tubes into a place to experience contemporary culture? Here is a glimpse in to the construction process of the ZEITS Museum of Contemporary Art Africa to be complete by March 2016.
The creative brainchild of Arthur Blake, Managing Director of Citiq Property Developments, brings this fun, bold, colourful stamp on the Newtown skyline has had the city curious since its inception.
What If is a week long series showcasing some of the imaginative work produced by the UCT Architecture Masters graduates of 2012.
Edition 3: What if our harbour and waterfront told new stories?
The V&A waterfront have recently introduced their first ever vertical garden as an integral part of the new Silo No. 1 development. This is the first building site & construction project in South Africa that has incorporated vertical gardens into its site hoardings.
Silo redevelopment for museum.